Education · Sports · Hospitality · AI
All projects
ProposedCelina, Texas·Mixed-use

Celina, Texas Sports & Ice District

A proposed $375–400 million North Texas district, using Phoenix and Las Vegas as reference models.

Phoenix reference rendering from the Celina concept pack — not a Celina site-specific design — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice / SSS Academies operator marks applied; not a completed-site photograph.
Phoenix reference rendering from the Celina concept pack — not a Celina site-specific design — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice / SSS Academies operator marks applied; not a completed-site photograph.Open original source concept
Location
Celina, North Texas
Preliminary budget
$375–400 million — sponsor-supplied range
Reference models
Phoenix Fire ’n’ Ice / SSS Academy and proposed Las Vegas district
Concept pack
Prepared for the City of Celina and Celina EDC, November 2026
The project

The North Texas project is identified as Celina by the supplied November 2026 concept pack. Its title presents Phoenix and Las Vegas as ‘the model for Celina,’ and the document was prepared for the City of Celina and Celina EDC. The sponsor has supplied a preliminary development range of $375–400 million for this proposed district.

The concept links education, ice sports, multi-sport training and hospitality. Phoenix provides the arena-and-academy reference; Las Vegas provides the broader district concept with three rinks, a main spectator rink, courts, aquatics, academic and wellness space, two proposed hotels and structured parking. Those elements describe the reference models, not a finalized Celina building programme.

The pictures and drawings below are the actual Phoenix and Las Vegas images included in the Celina presentation. They are deliberately labelled as reference concepts: the supplied pack does not contain a Celina-specific site plan or establish a selected site, municipal approval or an executed hotel affiliation.

A Celina-specific scheme would need confirmed land arrangements, design and entitlement work, financing and an independently supported job-creation analysis before an EB-5 offering could be described. This page will be updated as the sponsor supplies those documents. The preliminary budget is not a financing commitment, and this website is not an offer of securities.

Source and status: Fire N Ice / SSS Academy — Concept images: Phoenix and Las Vegas — the model for Celina, prepared for the City of Celina and Celina EDC, November 2026. The $375–400 million preliminary Celina budget is client-supplied. The pack does not establish City approval, site control or a Celina-specific plan.

Phoenix reference: arena and academy exterior concept — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice / SSS Academies operator marks applied; not a completed-site photograph. View full rendering
Phoenix reference: arena and academy exterior concept — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice / SSS Academies operator marks applied; not a completed-site photograph.Open original source concept
Las Vegas reference: hotel concept perspective
Las Vegas reference: hotel concept perspective
Open original image
Las Vegas reference: hotel concept perspective
Phoenix reference: multi-sport court hall rendering — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice operator marks applied; not a completed-site photograph. View full rendering
Phoenix reference: multi-sport court hall rendering — AI-enhanced illustrative rendering with authentic Fire ’n’ Ice operator marks applied; not a completed-site photograph.Open original source concept
Phoenix reference: Alpha1 AI learning centre rendering — AI-enhanced illustrative rendering with authentic Alpha1 AI operator marks applied; not a completed-site photograph. View full rendering
Phoenix reference: Alpha1 AI learning centre rendering — AI-enhanced illustrative rendering with authentic Alpha1 AI operator marks applied; not a completed-site photograph.Open original source concept
Source concepts

Concept drawings and reference exhibits.

Site plans, floor layouts and parking concepts from the supplied proposal materials. Each caption identifies its source and limitations. These are not approved or as-built drawings and do not establish site control, entitlement or delivered scope.

Las Vegas reference site plan — Included in the Celina concept presentation as a reference model, not a confirmed Celina site layout.
Las Vegas reference site plan — Included in the Celina concept presentation as a reference model, not a confirmed Celina site layout.
Open original image

Included in the Celina concept presentation as a reference model, not a confirmed Celina site layout.

Las Vegas reference main level — Reference programme for discussion. Celina’s final dimensions, facilities and phasing are not established by this drawing.
Las Vegas reference main level — Reference programme for discussion. Celina’s final dimensions, facilities and phasing are not established by this drawing.
Open original image

Reference programme for discussion. Celina’s final dimensions, facilities and phasing are not established by this drawing.

What defines it

The details that matter to an investor.

Selected from the source materials identified in this profile. Historical descriptions and proposed scope are not verified current terms or delivered milestones. Ask which definitive project, financing and offering documents exist and can be released; inclusion does not establish EB-5 eligibility.

01

$375–400 million preliminary sponsor-supplied range

02

Concept pack prepared for the City of Celina and Celina EDC

03

Phoenix and Las Vegas concepts presented as reference models

04

Education-anchored sports and hospitality approach

05

Actual reference imagery from the supplied November 2026 pack

06

Site-specific scope, approvals and capital structure remain to be documented

Location

Celina, Texas.

Location helps identify the relevant project and labor market, but a city or state label does not establish EB-5 eligibility. As of 21 November 2026, the statutory minimum is $1,050,000 generally, or $800,000 for qualifying investments in a targeted employment area — rural or high-unemployment — or a qualifying infrastructure project. An education facility, arena, public benefit or conduit municipal bond does not automatically establish either reduced-threshold category. Whether a project here qualifies, how its jobs are counted and whether a reduced threshold applies must be established in current project documents and reviewed with independent immigration counsel.

Capital categories, statutory dates and investment retention

Infrastructure has a specific statutory definition involving a governmental job-creating entity and a public works project. The statute reserves 20% of visas for rural investments, 10% for high-unemployment investments and 2% for infrastructure investments; visa availability and petition adjudication are separate.

The first inflation adjustment applies to petitions filed on or after 1 January 2027, with adjustments every five years. This profile publishes no unverified adjusted dollar amount. Regional-center visas are authorized through 30 September 2027. Separate expired-legislation protection covers qualifying regional-center-related petitions filed on or before 30 September 2026; that cutoff has passed. Legislative-lapse protection is not approval, and later filings are not described here as grandfathered.

Qualifying capital must genuinely be at risk. Under USCIS’s current post-RIA interpretation, petitions filed on or after 15 March 2022 generally require at least two years, measured from when the full qualifying capital is placed at risk and made available to the job-creating entity, as applicable. Pre-RIA investors generally sustain their investment through the two years of conditional residence. Job-creation issues may require more time and contracts may retain capital longer. This is not a universal through-I-829 rule, and completing an immigration minimum never triggers or guarantees repayment.

8 USC 1153(b)(5) · USCIS investor policy

Celina, TX, United States
Las Vegas reference: hotel concept perspective
Las Vegas reference: hotel concept perspective
Open original image
Las Vegas reference: hotel concept perspective
Project-specific evidence

A project description is not job eligibility or security.

EB-5 requires a qualifying new commercial enterprise — a for-profit organization engaged in ongoing lawful business — and at least ten qualifying full-time jobs per investor. Jobs held by the investor, spouse or children do not count. Preserving existing jobs is limited to the applicable troubled-business rules. A school, hotel, arena or construction budget alone does not establish qualifying employment or an investor allocation.

Applicable regional-center rules allow up to 90% indirectly estimated jobs. Indirect jobs from construction lasting less than two years can satisfy only up to 75%, and estimated direct short-construction jobs are duration-adjusted. Request the actual economic report, construction duration, expenditure evidence, model inputs and investor-allocation basis; completed construction or a modeled cushion is not automatic eligibility.

What to request before considering a subscription

Complete an investor suitability/eligibility questionnaire, engage independent counsel, and ask which PPM, subscription agreement, business plan, economic job report and escrow agreement exist for the selected project and can be released. Regional-center studies do not remove the investor's personal eligibility, lawful-funds or qualifying-investment responsibilities. No uniform document pack or current economist engagement is confirmed by this page.

Temporary or bridge financing may precede EB-5 replacement, but job credit is conditional: replacement generally must have been contemplated when temporary financing was obtained, or the funding intended as short-term financing to be replaced by longer-term capital. Qualifying capital must reach the business responsible for the jobs. Request the executed bridge agreements, expenditures and applicable project records.

For security, inspect the offering and executed financing documents for collateral, priority, senior debt, covenants, reporting/inspection/enforcement rights and intercreditor limits. Investor equity need not carry a direct mortgage; no senior lien, universal RIMS II method, completed pre-filing study or quarterly reporting is assumed. Sponsor screening is not USCIS approval.

USCIS investor policy · USCIS project and job-creation policy

Speak with the Fund

Request the available evidence for this project.

Ask which current job studies, executed financing and security documents, offering terms and phasing records exist and can be released. This profile is not an offer of securities and does not establish document availability or an investment, job, repayment or immigration outcome.