Education · Sports · Hospitality · AI
All projects
Historical proposalPahrump, Nevada·Mixed-use

Pahrump, Nevada — historical mixed-use proposal

A historical $298 million mixed-use proposal with school, hospitality, residential, storage and recreation components.

Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified.
Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified.Complete original brochure
Source location
Pahrump, Nevada
Historical proposed cost
$298,000,000
Programme
Hospitality, school and sports, housing, warehouse/storage, recreation and solar
Financing
Current structure not established by the source scan
The project

The original Pahrump proposal lists a casino, convention center and flex-office space; two hotel brands with 100 rooms each; modular and luxury housing; an RV park; and warehouse and storage facilities. Its stated project cost is $298,000,000. No hotel brands or executed affiliations are named, and the amount is a historical proposed cost rather than verified committed capital.

Phase 1 comprises the casino, RV park, hotel and retail center. Phase 1b comprises a K–12 school facility, sports facility, and convention-center and office facility. Phase 2 adds luxury housing and a solar farm. Phase 3 is described as a ski-resort development under due diligence. These are the source's proposed phases, not a confirmed 2026 construction schedule or a statement that the ski-resort acquisition or development has been approved.

The brochure includes an RV-park illustration, a residential-layout illustration, a warehouse-interior photograph and a mountain-resort photograph. It does not establish that these are photographs of the Pahrump site or identify the resort property. They are preserved as historical proposal illustrations, not as proof of site control or completed development.

Any present financing structure, project budget, entitlement status and job-creation basis require current sponsor documents. No qualifying job count, EB-5 allocation, visa outcome or principal repayment is established by this historical proposal.

Source and status: The separate Nevada proposal, numbered 13 on printed page 43 of the original website brochure, was publicly served on 21 November 2026. The proposal amount, programme and printed financing-result wording are historical source statements. Current stage, financing close, interest rate, collateral and investment availability have not been verified as of 21 November 2026.

Linked source records

Source review: 21 November 2026. Historical scan capture dates are not current offering dates. Issuer disclosures, operator statements and sponsor concepts are distinguished in the profile; a linked source does not confirm a private offering or successful document delivery.

Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified. View full rendering
Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified.Complete original brochure
Original brochure illustration. Residential-layout illustration — historical proposal concept, not an approved or as-built plan. Project-site identity and current completion status are unverified. View full rendering
Original brochure illustration. Residential-layout illustration — historical proposal concept, not an approved or as-built plan. Project-site identity and current completion status are unverified.Complete original brochure
Original brochure illustration. Warehouse-interior photograph — historical proposal illustration, not proof of Pahrump site control or completion. Project-site identity and current completion status are unverified. View full rendering
Original brochure illustration. Warehouse-interior photograph — historical proposal illustration, not proof of Pahrump site control or completion. Project-site identity and current completion status are unverified.Complete original brochure
Original brochure illustration. Mountain-resort photograph — historical proposal illustration; resort property and acquisition/development approval not identified. Project-site identity and current completion status are unverified. View full rendering
Original brochure illustration. Mountain-resort photograph — historical proposal illustration; resort property and acquisition/development approval not identified. Project-site identity and current completion status are unverified.Complete original brochure
Historical source evidence

Read the original proposal alongside the profile.

Record 13, printed page 43. This is an archival brochure scan, not a current offering memorandum. Compare all twelve historical summary rows and numbered records.

Pahrump: source-proposed phases

Historical proposal, not a confirmed 2026 construction schedule
Proposed phaseProgramme
Phase 1Casino, RV park, hotel and retail center
Phase 1bK–12 school facility, sports facility, and convention-center and office facility
Phase 2Luxury housing and solar farm
Phase 3Ski-resort development described as under due diligence; resort property, acquisition and approvals not established
Numbered record 13: Nevada / Pahrump mixed-use proposal — printed page 43

Original website brochure scan — preserved for historical reference. Printed project amounts and financing-result wording are not verified current terms. Open the full image to inspect the source.

Numbered record 13: Nevada / Pahrump mixed-use proposal — printed page 43

Open image in a new tabDownload source image

Scroll horizontally and vertically to inspect details. Escape closes the viewer.

Original website brochure scan — preserved for historical reference. Printed project amounts and financing-result wording are not verified current terms. Open the full image to inspect the source.

Source: original website upload (Nevada-project.jpg). Captured 21 November 2026; that is the source-review date, not an offering or project-completion date.

Images and drawings preserved in this source
  • RV-park illustration — historical proposal illustration; Pahrump site identity not established.
  • Residential-layout illustration — historical proposal concept, not an approved or as-built plan.
  • Warehouse-interior photograph — historical proposal illustration, not proof of Pahrump site control or completion.
  • Mountain-resort photograph — historical proposal illustration; resort property and acquisition/development approval not identified.
What defines it

The details that matter to an investor.

Selected from the source materials identified in this profile. Historical descriptions and proposed scope are not verified current terms or delivered milestones. Ask which definitive project, financing and offering documents exist and can be released; inclusion does not establish EB-5 eligibility.

01

Proposed K–12 school and sports facility in Phase 1b

02

Two proposed hotel brands with 100 rooms each; affiliations not named or executed

03

Casino, convention center, flex office and RV park proposed

04

Modular and luxury housing, warehouse and storage facilities

05

Solar farm in Phase 2; ski-resort development described as under due diligence in Phase 3

06

Historical cost and phasing, not committed capital or verified current development milestones

Location

Pahrump, Nevada.

Location helps identify the relevant project and labor market, but a city or state label does not establish EB-5 eligibility. As of 21 November 2026, the statutory minimum is $1,050,000 generally, or $800,000 for qualifying investments in a targeted employment area — rural or high-unemployment — or a qualifying infrastructure project. An education facility, arena, public benefit or conduit municipal bond does not automatically establish either reduced-threshold category. Whether a project here qualifies, how its jobs are counted and whether a reduced threshold applies must be established in current project documents and reviewed with independent immigration counsel.

Capital categories, statutory dates and investment retention

Infrastructure has a specific statutory definition involving a governmental job-creating entity and a public works project. The statute reserves 20% of visas for rural investments, 10% for high-unemployment investments and 2% for infrastructure investments; visa availability and petition adjudication are separate.

The first inflation adjustment applies to petitions filed on or after 1 January 2027, with adjustments every five years. This profile publishes no unverified adjusted dollar amount. Regional-center visas are authorized through 30 September 2027. Separate expired-legislation protection covers qualifying regional-center-related petitions filed on or before 30 September 2026; that cutoff has passed. Legislative-lapse protection is not approval, and later filings are not described here as grandfathered.

Qualifying capital must genuinely be at risk. Under USCIS’s current post-RIA interpretation, petitions filed on or after 15 March 2022 generally require at least two years, measured from when the full qualifying capital is placed at risk and made available to the job-creating entity, as applicable. Pre-RIA investors generally sustain their investment through the two years of conditional residence. Job-creation issues may require more time and contracts may retain capital longer. This is not a universal through-I-829 rule, and completing an immigration minimum never triggers or guarantees repayment.

8 USC 1153(b)(5) · USCIS investor policy

Pahrump, NV, United States
Original brochure illustration. Residential-layout illustration — historical proposal concept, not an approved or as-built plan. Project-site identity and current completion status are unverified. View full rendering
Original brochure illustration. Residential-layout illustration — historical proposal concept, not an approved or as-built plan. Project-site identity and current completion status are unverified.Complete original brochure
Project-specific evidence

A project description is not job eligibility or security.

EB-5 requires a qualifying new commercial enterprise — a for-profit organization engaged in ongoing lawful business — and at least ten qualifying full-time jobs per investor. Jobs held by the investor, spouse or children do not count. Preserving existing jobs is limited to the applicable troubled-business rules. A school, hotel, arena or construction budget alone does not establish qualifying employment or an investor allocation.

Applicable regional-center rules allow up to 90% indirectly estimated jobs. Indirect jobs from construction lasting less than two years can satisfy only up to 75%, and estimated direct short-construction jobs are duration-adjusted. Request the actual economic report, construction duration, expenditure evidence, model inputs and investor-allocation basis; completed construction or a modeled cushion is not automatic eligibility.

What to request before considering a subscription

Complete an investor suitability/eligibility questionnaire, engage independent counsel, and ask which PPM, subscription agreement, business plan, economic job report and escrow agreement exist for the selected project and can be released. Regional-center studies do not remove the investor's personal eligibility, lawful-funds or qualifying-investment responsibilities. No uniform document pack or current economist engagement is confirmed by this page.

Temporary or bridge financing may precede EB-5 replacement, but job credit is conditional: replacement generally must have been contemplated when temporary financing was obtained, or the funding intended as short-term financing to be replaced by longer-term capital. Qualifying capital must reach the business responsible for the jobs. Request the executed bridge agreements, expenditures and applicable project records.

For security, inspect the offering and executed financing documents for collateral, priority, senior debt, covenants, reporting/inspection/enforcement rights and intercreditor limits. Investor equity need not carry a direct mortgage; no senior lien, universal RIMS II method, completed pre-filing study or quarterly reporting is assumed. Sponsor screening is not USCIS approval.

USCIS investor policy · USCIS project and job-creation policy

Speak with the Fund

Request the available evidence for this project.

Ask which current job studies, executed financing and security documents, offering terms and phasing records exist and can be released. This profile is not an offer of securities and does not establish document availability or an investment, job, repayment or immigration outcome.