Education · Sports · Hospitality · AI
All projects
Historical modelMesquite, Texas·Education

Historical charter-campus development model

A historical K–12 campus concept combining education, athletics, retail and residential uses.

Original brochure illustration: PTAA-labelled exterior from the Colorado historical record — multistate model reference, NOT a verified Texas / Mesquite campus-expansion site photograph
Original brochure illustration: PTAA-labelled exterior from the Colorado historical record — multistate model reference, NOT a verified Texas / Mesquite campus-expansion site photographComplete original brochure
Historical geographic scope
Texas, Colorado, Nevada, Florida and Arizona; no current Mesquite construction site verified
Historical programme
Proposed college-preparatory K–12 campuses
Proposed retail
28,000 square feet complementing school population
Proposed athletics
35,000-square-foot gymnasium with indoor swimming pool
The project

Historical USA Education Fund materials described a construction partner adding schools and related projects in Texas, Colorado, Nevada, Florida and Arizona. The proposed K–12 college-preparatory campuses were described as A-grade mixed-use construction. That is a historical sponsor model, not a verified 2026 construction milestone for a specific Mesquite site.

The historical programme proposed 28,000 square feet of retail, a 35,000-square-foot gymnasium with an indoor swimming pool, 96–100 one-bedroom dormitory suites for multi-use occupancy, landscaped biking, rollerblading and walking trails, and running tracks around an athletic field. Actual delivered scope, permits and current construction progress require site-specific documents.

The historical academic programme described computer programming and engineering; multilingual classrooms in English, Spanish and Mandarin; foreign exchange programmes with Brazil, India and China; automation and 3D modelling; aptitude-based grade placement; and college-preparatory courses aimed at top U.S. universities. These are attributed historical programme descriptions, not independently verified services or admissions outcomes at every current campus.

Source and status: Historical sponsor ‘Project Description’ model, not a numbered financing record on the original Projects page. Proposed five-state scope does not establish a current Mesquite site or that every campus is delivering this specification as of 21 November 2026. ‘A-grade’ is a sponsor description, not a verified credit rating or accreditation.

Linked source records

Source review: 21 November 2026. Historical scan capture dates are not current offering dates. Issuer disclosures, operator statements and sponsor concepts are distinguished in the profile; a linked source does not confirm a private offering or successful document delivery.

Original brochure illustration: Colorado historical PTAA exterior reference — not a verified Texas campus-expansion site or proof of current campus condition View full rendering
Original brochure illustration: Colorado historical PTAA exterior reference — not a verified Texas campus-expansion site or proof of current campus conditionComplete original brochure
Original brochure illustration: PTAA / COS, El Paso County, Colorado concept, Waal.architecture, 8.3.21 and © 2021 Waal — multistate model reference, not a Texas site-specific, approved or as-built drawing View full rendering
Original brochure illustration: PTAA / COS, El Paso County, Colorado concept, Waal.architecture, 8.3.21 and © 2021 Waal — multistate model reference, not a Texas site-specific, approved or as-built drawingComplete original brochure
Original brochure illustration: Mesquite historical site sketch beside a PTAA-labelled building — contextual model reference, not an approved or as-built campus-expansion design View full rendering
Original brochure illustration: Mesquite historical site sketch beside a PTAA-labelled building — contextual model reference, not an approved or as-built campus-expansion designComplete original brochure
Original brochure illustration: school-building exterior from the Florida source group — site identity and current completion unverified; not a Texas campus-expansion photograph View full rendering
Original brochure illustration: school-building exterior from the Florida source group — site identity and current completion unverified; not a Texas campus-expansion photographComplete original brochure
Original brochure illustration: separate school-and-sports-campus aerial from the Florida source group — site identity and current completion unverified; not a Texas campus-expansion photograph View full rendering
Original brochure illustration: separate school-and-sports-campus aerial from the Florida source group — site identity and current completion unverified; not a Texas campus-expansion photographComplete original brochure
What defines it

The details that matter to an investor.

Selected from the source materials identified in this profile. Historical descriptions and proposed scope are not verified current terms or delivered milestones. Ask which definitive project, financing and offering documents exist and can be released; inclusion does not establish EB-5 eligibility.

01

Historical proposal: 28,000 square feet of retail integrated into the campus

02

Historical proposal: 35,000-square-foot gymnasium with indoor pool

03

Historical proposal: 96–100 one-bedroom dormitory suites

04

Historical programme described multilingual classrooms: English, Spanish and Mandarin

05

Historical programme described computing, engineering, automation, 3D modelling and international exchange

Location

Mesquite, Texas.

Location helps identify the relevant project and labor market, but a city or state label does not establish EB-5 eligibility. As of 21 November 2026, the statutory minimum is $1,050,000 generally, or $800,000 for qualifying investments in a targeted employment area — rural or high-unemployment — or a qualifying infrastructure project. An education facility, arena, public benefit or conduit municipal bond does not automatically establish either reduced-threshold category. Whether a project here qualifies, how its jobs are counted and whether a reduced threshold applies must be established in current project documents and reviewed with independent immigration counsel.

Capital categories, statutory dates and investment retention

Infrastructure has a specific statutory definition involving a governmental job-creating entity and a public works project. The statute reserves 20% of visas for rural investments, 10% for high-unemployment investments and 2% for infrastructure investments; visa availability and petition adjudication are separate.

The first inflation adjustment applies to petitions filed on or after 1 January 2027, with adjustments every five years. This profile publishes no unverified adjusted dollar amount. Regional-center visas are authorized through 30 September 2027. Separate expired-legislation protection covers qualifying regional-center-related petitions filed on or before 30 September 2026; that cutoff has passed. Legislative-lapse protection is not approval, and later filings are not described here as grandfathered.

Qualifying capital must genuinely be at risk. Under USCIS’s current post-RIA interpretation, petitions filed on or after 15 March 2022 generally require at least two years, measured from when the full qualifying capital is placed at risk and made available to the job-creating entity, as applicable. Pre-RIA investors generally sustain their investment through the two years of conditional residence. Job-creation issues may require more time and contracts may retain capital longer. This is not a universal through-I-829 rule, and completing an immigration minimum never triggers or guarantees repayment.

8 USC 1153(b)(5) · USCIS investor policy

Mesquite, TX, United States
Original brochure illustration: PTAA / COS, El Paso County, Colorado concept, Waal.architecture, 8.3.21 and © 2021 Waal — multistate model reference, not a Texas site-specific, approved or as-built drawing View full rendering
Original brochure illustration: PTAA / COS, El Paso County, Colorado concept, Waal.architecture, 8.3.21 and © 2021 Waal — multistate model reference, not a Texas site-specific, approved or as-built drawingComplete original brochure
Project-specific evidence

A project description is not job eligibility or security.

EB-5 requires a qualifying new commercial enterprise — a for-profit organization engaged in ongoing lawful business — and at least ten qualifying full-time jobs per investor. Jobs held by the investor, spouse or children do not count. Preserving existing jobs is limited to the applicable troubled-business rules. A school, hotel, arena or construction budget alone does not establish qualifying employment or an investor allocation.

Applicable regional-center rules allow up to 90% indirectly estimated jobs. Indirect jobs from construction lasting less than two years can satisfy only up to 75%, and estimated direct short-construction jobs are duration-adjusted. Request the actual economic report, construction duration, expenditure evidence, model inputs and investor-allocation basis; completed construction or a modeled cushion is not automatic eligibility.

What to request before considering a subscription

Complete an investor suitability/eligibility questionnaire, engage independent counsel, and ask which PPM, subscription agreement, business plan, economic job report and escrow agreement exist for the selected project and can be released. Regional-center studies do not remove the investor's personal eligibility, lawful-funds or qualifying-investment responsibilities. No uniform document pack or current economist engagement is confirmed by this page.

Temporary or bridge financing may precede EB-5 replacement, but job credit is conditional: replacement generally must have been contemplated when temporary financing was obtained, or the funding intended as short-term financing to be replaced by longer-term capital. Qualifying capital must reach the business responsible for the jobs. Request the executed bridge agreements, expenditures and applicable project records.

For security, inspect the offering and executed financing documents for collateral, priority, senior debt, covenants, reporting/inspection/enforcement rights and intercreditor limits. Investor equity need not carry a direct mortgage; no senior lien, universal RIMS II method, completed pre-filing study or quarterly reporting is assumed. Sponsor screening is not USCIS approval.

USCIS investor policy · USCIS project and job-creation policy

Speak with the Fund

Request the available evidence for this project.

Ask which current job studies, executed financing and security documents, offering terms and phasing records exist and can be released. This profile is not an offer of securities and does not establish document availability or an investment, job, repayment or immigration outcome.