
Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified.
A proposed $300–400 million North Dallas development, using North Phoenix and Vegas project concepts as reference models.

North Dallas is the proposed development's current name, confirmed by the sponsor on 22 November 2026. The latest preliminary sponsor estimate is $300–400 million, superseding the earlier $375–400 million estimate. This is the renamed proposal represented by the November 2026 source concept pack, not a newly invented second Texas development and not the operating PTAA North Dallas charter campus. The range is a development budget estimate, not committed capital or an available investment offer.
The concept links education, ice sports, multi-sport training and hospitality. North Phoenix provides the arena-and-academy reference; the Vegas project provides the broader district reference with three rinks, a main spectator rink, courts, aquatics, academic and wellness space, two proposed hotels and structured parking. Those elements describe reference models, not a finalized North Dallas building programme.
The pictures and drawings below are the actual Phoenix and Las Vegas reference images included in the November 2026 source concept pack, which was prepared for a municipal/EDC audience—not with an established municipal partner. Original source wording and documents are preserved unchanged. The images remain deliberately labelled as reference concepts: the supplied pack does not contain a North Dallas-specific site plan or establish a selected site, municipal approval or an executed hotel affiliation.
A North Dallas-specific scheme still needs confirmed land arrangements, design and entitlement work, financing and an independently supported job-creation analysis before an EB-5 offering could be described. The public-name correction does not establish those milestones. This page will be updated as the sponsor supplies supporting documents. The preliminary budget is not a financing commitment, and this website is not an offer of securities.
Source and status: November 2026 source concept pack: Fire N Ice / SSS Academy Phoenix and Las Vegas reference images, originally prepared for a municipal/EDC audience, not evidence of municipal participation or approval. The sponsor confirmed North Dallas as the development's current name and supplied the latest $300–400 million preliminary range on 22 November 2026, superseding the earlier $375–400 million estimate. The original source document remains unchanged. Site control, final site-specific design, approval and financing are not established, and this development is distinct from operating PTAA North Dallas.
View full rendering
View full rendering
View full renderingSite plans, floor layouts and parking concepts from the supplied proposal materials. Each caption identifies its source and limitations. These are not approved or as-built drawings and do not establish site control, entitlement or delivered scope.
Included in the November 2026 source concept pack as a Vegas project reference model, not a confirmed North Dallas site layout or approval.
Vegas project reference programme for discussion. North Dallas's final dimensions, facilities and phasing are not established by this drawing.
Selected from the source materials identified in this profile. Historical descriptions and proposed scope are not verified current terms or delivered milestones. Ask which definitive project, financing and offering documents exist and can be released; inclusion does not establish EB-5 eligibility.
$300–400 million latest preliminary sponsor-supplied range, 22 November 2026
North Dallas is the confirmed current proposal name; operating PTAA North Dallas remains separate
North Phoenix and Vegas project concepts presented as reference models
Education-anchored sports and hospitality approach
Actual reference imagery from the supplied November 2026 pack
Site-specific scope, approvals and capital structure remain to be documented
Location helps identify the relevant project and labor market, but a city or state label does not establish EB-5 eligibility. As of 21 November 2026, the statutory minimum is $1,050,000 generally, or $800,000 for qualifying investments in a targeted employment area — rural or high-unemployment — or a qualifying infrastructure project. An education facility, arena, public benefit or conduit municipal bond does not automatically establish either reduced-threshold category. Whether a project here qualifies, how its jobs are counted and whether a reduced threshold applies must be established in current project documents and reviewed with independent immigration counsel.
Infrastructure has a specific statutory definition involving a governmental job-creating entity and a public works project. The statute reserves 20% of visas for rural investments, 10% for high-unemployment investments and 2% for infrastructure investments; visa availability and petition adjudication are separate.
The first inflation adjustment applies to petitions filed on or after 1 January 2027, with adjustments every five years. This profile publishes no unverified adjusted dollar amount. Regional-center visas are authorized through 30 September 2027. Separate expired-legislation protection covers qualifying regional-center-related petitions filed on or before 30 September 2026; that cutoff has passed. Legislative-lapse protection is not approval, and later filings are not described here as grandfathered.
Qualifying capital must genuinely be at risk. Under USCIS’s current post-RIA interpretation, petitions filed on or after 15 March 2022 generally require at least two years, measured from when the full qualifying capital is placed at risk and made available to the job-creating entity, as applicable. Pre-RIA investors generally sustain their investment through the two years of conditional residence. Job-creation issues may require more time and contracts may retain capital longer. This is not a universal through-I-829 rule, and completing an immigration minimum never triggers or guarantees repayment.
EB-5 requires a qualifying new commercial enterprise — a for-profit organization engaged in ongoing lawful business — and at least ten qualifying full-time jobs per investor. Jobs held by the investor, spouse or children do not count. Preserving existing jobs is limited to the applicable troubled-business rules. A school, hotel, arena or construction budget alone does not establish qualifying employment or an investor allocation.
Applicable regional-center rules allow up to 90% indirectly estimated jobs. Indirect jobs from construction lasting less than two years can satisfy only up to 75%, and estimated direct short-construction jobs are duration-adjusted. Request the actual economic report, construction duration, expenditure evidence, model inputs and investor-allocation basis; completed construction or a modeled cushion is not automatic eligibility.
Complete an investor suitability/eligibility questionnaire, engage independent counsel, and ask which PPM, subscription agreement, business plan, economic job report and escrow agreement exist for the selected project and can be released. Regional-center studies do not remove the investor's personal eligibility, lawful-funds or qualifying-investment responsibilities. No uniform document pack or current economist engagement is confirmed by this page.
Temporary or bridge financing may precede EB-5 replacement, but job credit is conditional: replacement generally must have been contemplated when temporary financing was obtained, or the funding intended as short-term financing to be replaced by longer-term capital. Qualifying capital must reach the business responsible for the jobs. Request the executed bridge agreements, expenditures and applicable project records.
For security, inspect the offering and executed financing documents for collateral, priority, senior debt, covenants, reporting/inspection/enforcement rights and intercreditor limits. Investor equity need not carry a direct mortgage; no senior lien, universal RIMS II method, completed pre-filing study or quarterly reporting is assumed. Sponsor screening is not USCIS approval.
USCIS investor policy · USCIS project and job-creation policy
Mesquite, Texas · Education

Original brochure illustration. RV-park illustration — historical proposal illustration; Pahrump site identity not established. Project-site identity and current completion status are unverified.

Original brochure illustration. Mesquite residential exterior rendering — view 2. Historical brochure concept, not an approved or as-built drawing. Project-site identity and current completion status are unverified.

Original brochure illustration. Mesquite residential exterior rendering — view 1. Historical brochure concept, not an approved or as-built drawing. Project-site identity and current completion status are unverified. Shared page 36 reference: the original scan contains both Mesquite, Texas and Mesquite, Nevada records. These drawings accompany the Texas / 79-home concept; the page does not establish a Nevada-specific design, site or unit mix.
Ask which current job studies, executed financing and security documents, offering terms and phasing records exist and can be released. This profile is not an offer of securities and does not establish document availability or an investment, job, repayment or immigration outcome.